    Hi all,
    Consider installing a fully reticulated system with 2 ROs can prevent the risk of failure occurring. It also means that the system can still function when undergoing repairs or maintenance. It can be more costly but worth considering for risk management.
    Regards,
    Fleur

    Fleur Hastings
    Infection Control Coordinator
    East Wimmera Health Service
    Victoria

    Sent from my iPhone

    > On 12 Dec 2020, at 12:47 am, Stephen Adnams wrote:
    >
    > Good evening Kate,
    >
    > My advice would be for the department to carry out their own risk assessment.
    >
    > The first thing to think about is why do you currently use RO water. If filtration was your solution, why install an additional system.
    >
    > If you feel you can carry on reprocessing with minimal risk to your patients and you have a documented risk assessment, then you can choose the best options for your department.
    >
    > If you installed an RO system because your incoming water is not compliant, then you need to look in to the risk. I would assume your incoming water in non-compliant, so the risk would be too great and you should shut down your equipment until your issue is resolved.
    >
    > That risk assessment can only be carried out by your site. There are many factors that come in to play.
    >
    > I am more than happy to assist further if needed.
    >
    > Regards,
    >
    > Stephen Adnams
    >
    > T 1300 680 898
    > F +61 3 9533 6193
    > M +61 403 129 444
    >
    > If you have received this message in error, please notify us and remove it from your email system.
    > Please consider the environment before deciding to print this email.
    >
    >>> On 11 Dec 2020, at 21:25, RYAN, Kate wrote:
    >>>
    >>
    >> Hi All,
    >> I am looking at business continuity plans for our sterilising department and would like to know what you would do and why to guide the update of our plans:
    >>
    >> If your RO plant went down and was unavailable, would you:
    >> A- switch to mains water if your equipment allowed for this?
    >> B- shut down your equipment/servicces that requires RO until the problem was resolved?
    >>
    >> If you chose A – is this because:
    >> 1- you have additional filtration of your mains water that brings it closer in alignment to the water requirements of AS4187
    >> 2- there is more pressure to maintain surgery levels/CSSD operations than allowing you to shut down?
    >> 3- Other?
    >>
    >> Thanks for your help.
    >>
    >> Kind regards
    >>
    >> Kate Ryan
    >>
    >> RMD Program Officer
    >>
    >>
    >>
    >> 0434 609 208 | 03 9496 6706
    >>
    >> Infectious Diseases Department
    >> Level 7, Harold Stokes Building
    >> 145 Studley Road, Heidelberg
    >> PO Box 5555, Victoria, 3084
    >>
    >> MESSAGES POSTED TO THIS LIST ARE SOLELY THE OPINION OF THE AUTHOR, AND DO NOT REPRESENT THE OPINION OF ACIPC.
    >> The use of trade/product/commercial brand names through the list is discouraged by ACIPC. If you wish to discuss specific reference to products or services by brand or commercial names, please do this outside the list.
    >>
    >> Archive of all messages are available at http://aicalist.org.au/archives – registration and login required.
    >>
    >> Replies to this message will be directed back to the list. To create a new message send an email to acipclist@acipc.org.au
    >>
    >> To send a message to the list administrator send an email to admin@acipc.org.au
    >>
    >> You can unsubscribe manually from this list by sending ‘signoff acipclist’ (without the quotes) to listserv@aicalist.org.au
    >>
    > MESSAGES POSTED TO THIS LIST ARE SOLELY THE OPINION OF THE AUTHOR, AND DO NOT REPRESENT THE OPINION OF ACIPC.
    > The use of trade/product/commercial brand names through the list is discouraged by ACIPC. If you wish to discuss specific reference to products or services by brand or commercial names, please do this outside the list.
    >
    > Archive of all messages are available at http://aicalist.org.au/archives – registration and login required.
    >
    > Replies to this message will be directed back to the list. To create a new message send an email to acipclist@acipc.org.au
    >
    > To send a message to the list administrator send an email to admin@acipc.org.au
    >
    > You can unsubscribe manually from this list by sending ‘signoff acipclist’ (without the quotes) to listserv@aicalist.org.au

    MESSAGES POSTED TO THIS LIST ARE SOLELY THE OPINION OF THE AUTHOR, AND DO NOT REPRESENT THE OPINION OF ACIPC.

    The use of trade/product/commercial brand names through the list is discouraged by ACIPC. If you wish to discuss specific reference to products or services by brand or commercial names, please do this outside the list.

    Archive of all messages are available at http://aicalist.org.au/archives – registration and login required.

    Replies to this message will be directed back to the list. To create a new message send an email to acipclist@acipc.org.au

    To send a message to the list administrator send an email to admin@acipc.org.au

    You can unsubscribe manually from this list by sending ‘signoff acipclist’ (without the quotes) to listserv@aicalist.org.au

Viewing 1 post (of 1 total)