Select Page

Re: Validation of sterilisation processes

Home Forums Infexion Connexion Re: Validation of sterilisation processes

 | Click to Receive Email Notifications of Posts
Viewing 1 post (of 1 total)
  • Author
    Posts
  • #76497
    Lalith Ramachandra
    Participant

    Author:
    Lalith Ramachandra

    Position:

    Organisation:

    State:

    Hello Matthew

    AS4187 covers the issue of validation in detail.

    For a high pre-vac steriliser the most basic validation, other than the process, would be the pressure and temperature – making sure you have saturated steam at the right temperature for the correct duration.

    Table 7.2 covers the steam quality etc.

    Hope this helps.

    Cheers

    Sent from LR Consulting Engineers

    > On 18 Mar 2020, at 5:45 pm, Matthew Mason wrote:
    >

    MESSAGES POSTED TO THIS LIST ARE SOLELY THE OPINION OF THE AUTHOR, AND DO NOT REPRESENT THE OPINION OF ACIPC.

    The use of trade/product/commercial brand names through the list is discouraged by ACIPC. If you wish to discuss specific reference to products or services by brand or commercial names, please do this outside the list.

    Archive of all messages are available at http://aicalist.org.au/archives – registration and login required.

    Replies to this message will be directed back to the list. To create a new message send an email to acipclist@acipc.org.au

    To send a message to the list administrator send an email to admin@acipc.org.au

    You can unsubscribe manually from this list by sending ‘signoff acipclist’ (without the quotes) to listserv@aicalist.org.au

Viewing 1 post (of 1 total)
  • The forum ‘Infexion Connexion’ is closed to new topics and replies.